Storm-water drainage in Kuwait - Shaab

Storm-water drainage in Shaab

Storm drainage in Shaab serves residential and beachfront hotel buildings on plots near sea-level elevation. We design tanks and pipes with salt-resistant materials and seawall protection to prevent seawater infiltration into foundations.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Shaab is a low-lying coastal district near the sea, with mid-rise apartment buildings or hotels and resorts. This seaside location means groundwater is saline and soil is wet, requiring pipes of corrosion-resistant materials such as galvanised steel or high-density PVC, and tanks protected from surging seawater infiltration. We also review the groundwater table before excavation to set tank depth and overflow routing.

Shaab sits in Hawalli governorate on the coast near Sha'ab Park and Sha'ab Leisure Park, a beachfront district of hotel and residential buildings.

Groundwater level in Shaab is very close to surface, usually between 0.5 and 1.5 metres, requiring overflow tanks designed above the water table.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Shaab

Call now
Can seawater enter the drainage network during high tide?

Yes, the risk is high in Shaab. We fit non-return valves on pipe outlets toward the sea and use double-walled tanks to prevent seawater seepage. We also raise tank elevation above the highest predicted groundwater level.

What materials work best for pipes in a salt coastal environment?

We use high-density PVC or galvanised steel pipes with thick epoxy coating. Uncoated iron and unprotected concrete corrode quickly in Shaab due to high salinity and moisture.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works