Storm-water drainage in Kuwait - Jleeb Al-Shuyoukh

Storm-water drainage in Jleeb Al-Shuyoukh

Storm drainage in Jleeb Al-Shuyoukh serves dense residential blocks and seasonal rainfall. We design pipes and channels to clear water fast from rooftops and packed courtyards to the approved collection points.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most buildings in Jleeb Al-Shuyoukh are multi-storey residential blocks on medium plots with tight shared courtyards between them. Rain pools quickly on flat roofs and paved areas, so the drainage network needs isolated vertical stacks and horizontal channels separate from the sewage line. We install roof drains along all high edges and isolated downpipes per plot, with simple sand filters before final collection.

Jleeb Al-Shuyoukh sits in Farwaniya governorate, a zone of dense residential blocks and local market activity.

Main drainage pipes are typically 150 mm to 200 mm bore to handle rainfall loads from several roofs simultaneously.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Jleeb Al-Shuyoukh

Call now
How do you stop water pooling in the shared courtyards between blocks?

We grade the courtyard with a slight slope toward central drainage lines and install floor grates with metal screens to block debris, with isolated downpipes per building block.

Do you fully separate the storm network from the sewage line?

Yes, complete separation from source. Storm pipes have their own route and depth separate from sewage, with inspection covers per network for easier maintenance.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works