Sewage contractor in Kuwait - Abraq Khitan

Sewage contractor in Abraq Khitan

Sewer installation in Abraq Khitan combines relatively newer residential buildings on regular plots with precise slope calculations based on local ground levels. We bury pipes at approved diameters and separations and test them before handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abraq Khitan has modern villas and residential buildings on relatively regular plots with stable ground topography compared to other areas. The sewer network starts inside each villa or building and extends under passages and internal streets toward the public network connection point. We coordinate with the municipality's roads and landscaping department to avoid clashing with other works, and we use trenchless excavation techniques when crossing under paved roads.

Abraq Khitan is in Farwaniya governorate, a relatively modern residential area of regular villas and apartment buildings.

Buried pipes in modern residential areas are typically PVC or HDPE and are laid at a depth of at least 80 centimetres below ground level.

Back to Sewage contractor

What the service covers - Sewage contractor

What the service covers

Sewer network installation from internal drain points through buried runs to the public network.

  • Sewer network installation

    Buried uPVC pipe runs at correct gradient from building to public network.

  • Inspection chambers

    Concrete or precast chambers at every junction and change of direction.

  • Excavation and backfill

    Trench digging, sand bedding and compacted backfill after testing.

  • Public network tie-in

    Sealed and approved entry into the nearest municipal inspection manhole.

  • Flow and pressure test

    Full network flow test confirming gradient and zero leakage before closing.

  • Surface reinstatement

    Paving or tiling restoration over excavated areas after work is complete.

How it works.

  1. Contact and survey

    Call or WhatsApp to schedule a site survey visit.

  2. Network design

    Plot the pipe route, set gradients and confirm chamber locations.

  3. Excavation and pipe laying

    Dig trenches, lay sand bed, run uPVC pipes and build chambers.

  4. Testing and tie-in

    Run flow test then make the sealed tie-in to the municipal manhole.

  5. Backfill and reinstatement

    Layer and compact backfill then restore all surface finishes.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Sewage contractor in Abraq Khitan

Call now
Do you use special excavation techniques when crossing under paved roads?

Yes, we use trenchless techniques such as directional drilling or pipe jacking when crossing under existing roads, to avoid pavement damage and maintain road engineering integrity.

What depth should pipes be at in a modern residential area?

We follow approved specifications which require a minimum depth of 80 centimetres to protect pipes from loads and mechanical damage in standard residential areas, with greater depths under main roads.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works