Central gas lines in Kuwait - Abraq Khitan

Central gas lines in Abraq Khitan

Safe gas line installation in Abraq Khitan serves hundreds of villas and newer apartment blocks in the residential district. We run tubing from the central meter to every gas appliance and conduct full pressure testing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abraq Khitan is a newer residential zone with mostly small to medium villas with unified kitchens and apartment blocks with standard floor plans. Villas need a limited number of burner points distributed across the kitchen, interior room and rear yard, requiring slightly complex routing. Apartment blocks require separate tubing in load-bearing walls between units with independent meters. All tubing in the district is pressure-tested at 1.5 times the maximum allowable pressure and documented on final service drawings.

Abraq Khitan is in Farwaniya governorate as a newer residential zone surrounded by government and co-operative housing projects.

We maintain at least 30 centimetres separation between gas lines and electrical wiring in walls and ceilings.

Back to Central gas lines

What the service covers - Central gas lines

What the service covers

Gas line works from main entry to every burner point in homes and commercial kitchens

  • Central gas first-fix

    Main gas runs concealed in walls before plastering and finishing

  • Restaurant gas lines

    High-capacity lines sized for commercial kitchen burner loads

  • Appliance connection points

    Isolated stub-outs for each appliance: cooker, heater, generator

  • Pressure testing

    Air-pressure test across the full network before gas is admitted

  • Isolation valves

    Shut-off valves fitted at each branch and at the building entry point

  • As-built drawings

    Actual pipe routes recorded for future maintenance or modification

How it works.

  1. First contact

    Call or WhatsApp us to describe the project and book a site visit

  2. Site survey

    We measure routes, calculate loads and specify correct pipe sizes

  3. Quotation

    A detailed quote covering materials, quantities and all work items

  4. Installation

    Pipes, joints and valves installed according to the approved layout

  5. Test and handover

    Air-pressure test passed, handover protocol signed, as-built drawings delivered

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Central gas lines in Abraq Khitan

Call now
Are gas lines in Abraq Khitan standardised or customised per villa?

Most follow the villa model standard, but we add optional extra burner points per owner request. Each line is tested separately after installation before connecting to the main network.

Do you fully separate gas lines between residential units in apartment blocks?

Yes, each unit has its own independent meter and separate tubing from the building's entry point. We document each line's route on service maps for future maintenance and repair.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works