Wall-hung toilet installation in Kuwait - Abbasiya

Wall-hung toilet installation in Abbasiya

Wall-hung toilet installation in Abbasiya deals with walls of multi-storey apartment buildings on medium-sized urban plots. We anchor the unit on four bolts and check for leaks before handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya is a residential district with six to eight-storey buildings, and internal bathrooms are narrow with walls of brick and sometimes recycled concrete. Water and drainage pipes run vertically through shared walls between units, so we avoid anchoring the frame on the expected pipe line. Before installation we obtain the building drawing from the unit owner and verify pipe location with a metal detector, then anchor the unit so no bolts block future maintenance access.

Abbasiya is located in Farwaniya governorate, a residential area of multi-storey buildings with tight shared walls.

Wall-hung toilet installation in an apartment requires a front clearance of at least forty centimetres from wall to floor for comfortable access.

Back to Wall-hung toilet installation

See also: Sanitary fixture installation in Abbasiya

What the installation covers - Wall-hung toilet installation

What the installation covers

Every step from frame fixing to the first operational flush test

  • Carrier frame fixing

    Steel carrier frame anchored to the wall with chemical fixings

  • Concealed cistern fitting

    Cistern seated inside the frame with supply connections and flush button

  • Drain outlet connection

    Toilet outlet connected to the drain line at the correct height

  • Supply line connection

    Cold supply connected with a flexible hose and isolation valve

  • Pan hanging and levelling

    Pan hung on the steel arms at the specified height, fully level

  • Operational test

    Double flush test confirms no leaks at any joint or seal

How it works.

  1. Call or whatsApp

    Share a photo of the bathroom and drain location to book a visit

  2. Site survey

    Technician checks wall, drain and supply positions, confirms frame type

  3. Quote approval

    Detailed cost is presented and work begins after client approval

  4. Installation

    Frame anchored, cistern fitted, pan hung and all connections made

  5. Test and handover

    Double flush and joint check completed before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall-hung toilet installation in Abbasiya

Call now
How do we avoid damaging hidden water and drainage pipes in the wall?

We request the building drawing from the unit owner and study the recorded pipe location. We use a metal detector before drilling any hole and avoid the designated pipe zone.

Can we install a wall-hung toilet in place of an old floor-mounted one in the same spot?

Yes, but we may need to seal the old floor drain opening and reroute pipes to the wall. We open the wall from behind and connect pipes with approved fittings and clean the site of debris.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works