Shower installation in Kuwait - Farwaniya

Shower installation in Farwaniya

Shower installation in Farwaniya involves opening an existing wall, running pipes from nearby main fixtures, and testing flow and water sealing. The mid-rise and newer apartment blocks in Farwaniya require precise connection of the shower to water and drainage networks in the internal walls.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Farwaniya apartment blocks are typically 4 to 8 storeys with small to medium-sized units, and bathrooms are tight with limited space. When installing a new or replacing an old shower, we locate the existing pipe routes in the internal walls and unit partitions, then open the aperture to fit the body and mixer. We install the connection fittings and rubber seals carefully to prevent water leakage into the walls or neighbouring units, then test pressure, flow and sealing before final handover.

Farwaniya sits in Farwaniya governorate, a district of mid-rise apartment blocks with tight units near the Third Ring Road.

Apartment walls in Farwaniya are typically 15 centimetres of lightweight brick or concrete block, making it easier to open pipe routes.

Back to Shower installation

See also: Sanitary fixture installation in Farwaniya

What the installation covers - Shower installation

What the installation covers

Wall opening and pipe connection through to a full running test at handover

  • Supply line check

    Confirm hot and cold rough-in branches exist and hold working pressure

  • Mixer or head connection

    Connect mixer body or fixed head to branches with rated sealing rings

  • Drain line connection

    Fit floor trap with correct fall toward the main drain line

  • Plate and bracket fixing

    Anchor wall plate and brackets using chemical fixings where the wall requires

  • Silicone sealing

    Seal every wall penetration and trap rim with neutral-cure sanitary silicone

  • Operational test

    Run hot and cold flow, confirm drain speed, check every joint for drips

How it works.

  1. Call or whatsApp

    Tell us the shower type, bathroom location and wall material

  2. Site inspection

    Technician checks hidden pipe route, trap condition and water pressure

  3. Quotation

    You receive a clear scope and price before any work begins

  4. Installation

    Pipes connected, shower fitted, all joints and wall penetrations sealed

  5. Test and handover

    Full run to confirm pressure, drain speed and seal integrity before handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Shower installation in Farwaniya

Call now
Can a new shower be installed in an old unit without expanding the bathroom?

Yes, if there is a location with nearby water and drainage pipes running beneath. We mount the body and mixer in the same spot or beside it without expanding the space, but must ensure the new pipes do not cross electrical wiring.

What is the difference between replacing an old shower and installing a new one in an empty space?

Replacement is faster because the pipes and opening already exist, while a new installation requires opening a wall and extending pipes from nearby fixtures, which takes longer and needs more precise water sealing testing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works