Bathtub installation in Kuwait - Qibla

Bathtub installation in Qibla

Bathtub installation in Qibla involves removing the old unit, levelling the floor, setting the new tub level and sealed, then connecting to drainage lines. Qibla has mixed residential and commercial buildings on plots of varying depths, which affects access to the drain outlet and the run of service pipes.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most bathrooms in Qibla are in three- to six-storey residential buildings, with tubs usually against an outer or inner wall separating two units. Before installation, we verify the floor level and existing waterproofing below it, and confirm the drain line is clear and unobstructed. Floors may be ceramic tile or old terrazzo, so we use high-bond cement to ensure the new tub sits level and stable without settlement gaps.

Qibla is in Kuwait Capital governorate, a dense district of residential apartment blocks and shops near Gulf Road.

The typical bathroom depth in Qibla is 1.8 to 2.2 metres, with the drain line usually directly beneath the floor or in the rear wall.

Back to Bathtub installation

See also: Sanitary fixture installation in Qibla

What the work covers - Bathtub installation

What the work covers

Installation covers every stage from removing the old unit to final operational testing.

  • Site assessment

    Measure the recess and confirm existing supply and drain rough-in positions.

  • Old unit removal

    Disconnect and extract the old bathtub without damaging surrounding tiles.

  • Bathtub fixing

    Level the unit on its supports and set the correct fall toward the drain outlet.

  • Supply connection

    Connect supply hoses to isolation valves and regulate inlet pressure if needed.

  • Drain connection

    Fit the overflow waste trap and connect to the drain line with verified fall.

  • Sealing and handover

    Apply sanitary silicone around the perimeter and run a full soak test.

How it works.

  1. Call or whatsApp

    Describe the tub type, location and any issues with existing pipework.

  2. Site inspection

    Technician visits to measure the recess and assess supply and drain lines.

  3. Quotation

    You receive a clear scope and cost breakdown before any work starts.

  4. Installation and sealing

    Fix the tub, connect supply and drain, seal the perimeter with sanitary silicone.

  5. Test and handover

    Fill the tub and confirm zero leaks at all joints before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathtub installation in Qibla

Call now
How do you prevent water seeping around the tub after installation?

We waterproof the floor and rear wall with a membrane before setting the tub, then apply flexible, fungus-resistant silicone caulk to all gaps between the tub and walls to prevent water seeping into masonry or adjacent structures.

Do you remove the old tub and clean the area before installing the new one?

Yes, we carefully remove the old tub, clean the floor of mortar and debris, inspect the drain line for blockages, then level the floor and install the new tub.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works