Municipal sewer connection in Kuwait - Khitan

Municipal sewer connection in Khitan

Municipal sewer connection in Khitan includes inspecting existing pipes and extending new lines to the manhole chamber. We conduct water testing after all joints are complete.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khitan is a residential area mixing older villas with modern apartment buildings, and many properties have outdated or incompletely connected drainage systems to the public network. Old pipes may be clay or simple cement and require replacement or upgrading. We inspect the line with a camera beforehand to identify damage and blockages, and coordinate with municipality bodies to confirm required pipe standards.

Khitan sits in Farwaniya governorate, near Farwaniya Hospital and Khitan Consumer Co-operative.

Drainage pipes in Khitan must be PVC or reinforced concrete at least 150 mm diameter per municipal standards.

Back to Municipal sewer connection

What the service covers - Municipal sewer connection

What the service covers

We run the private drain line out to the public manhole, test and reinstate

  • Connection survey

    Locating the public manhole and planning the pipe route

  • Trench excavation

    Cutting the trench to adequate depth without disturbing nearby foundations

  • uPVC pipe run

    Laying uPVC drain pipe on a sand bed with continuous fall to the network

  • Intermediate chamber

    Setting an inspection chamber at bends and at required inspection intervals

  • Public manhole entry

    Coring the manhole wall and sealing the connection with hydraulic mortar

  • Flow test and backfill

    Running a water flow test before backfilling the trench in compacted layers

How it works.

  1. First contact

    Call or WhatsApp us describing the building location and connection need

  2. Site survey

    Our engineer visits to locate the public manhole and plan the route

  3. Quotation

    A detailed quote covering excavation, pipes, chambers and reinstatement is issued

  4. Works and testing

    We excavate, lay pipe, connect to manhole and flow-test before backfilling

  5. Backfill and handover

    Trench is compacted in layers, surface reinstated and site handed over clean

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Municipal sewer connection in Khitan

Call now
Can old clay drainage pipes be replaced with new pipes?

Yes, we inspect the old line with a camera first to assess its condition, then remove damaged pipes and install a new PVC or reinforced concrete line meeting municipality standards.

Does the inspection include camera footage of the pipes before starting work?

Yes, we use a pipe inspection camera to locate damage, blockages, and leaks, and provide a detailed report before planning the work.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works