First-fix plumbing, new houses in Kuwait - Khitan

First-fix plumbing, new houses in Khitan

First-fix plumbing in Khitan starts with running water and drain lines before walls and floors are built. This area has closely spaced villas and residential blocks requiring careful network separation.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khitan is a residential area with rocky base and sandy layers, villas built on tight plots of 20 to 35 metres, and apartment buildings of 3 to 5 storeys. Pipe runs must avoid unnecessary crossings because any future repair means heavy cutting. Sandy soil also needs careful handling when burying drainage lines, with proper backfill and compaction to prevent settlement and leaks.

Khitan is in Farwaniya governorate near Farwaniya Hospital, a densely built residential neighbourhood.

Buried drainage lines in the foundation need compacted sand backfill to prevent subsidence and contaminated water seepage.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Khitan

Call now
Do you handle high groundwater in Khitan when laying pipes?

Yes, we install sump points and pumping stations during excavation and pouring, and protect pipes with waterproof layers and thick-walled pipes to resist water pressure.

How many inspection and cleaning points are needed in a villa's drainage network?

We install at least one inspection point every 30 to 40 metres of pipe, plus an extra point at any change in direction or line gradient.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works