First-fix plumbing, new houses in Kuwait - Abraq Khitan

First-fix plumbing, new houses in Abraq Khitan

First-fix plumbing in Abraq Khitan focuses on running water and drain lines within the concrete structure before walls close. The area has modern villas and mid-rise buildings requiring precise network design.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abraq Khitan is a relatively new residential area with modern villas on plots of 30 to 50 metres and buildings of 5 to 7 storeys. The soil here is more stable than neighbouring areas, allowing pipes to run at shallower depth with less protection needed. Most villas have underground tanks plus roof tanks, so water supply and return pipes must be carefully planned to avoid crossing load-bearing elements.

Abraq Khitan is in Farwaniya governorate as a relatively new residential district with high-quality construction standards.

Foundation pipes here need a minimum depth of 60 centimetres below natural grade for better protection from pressure and external impacts.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Abraq Khitan

Call now
Can water and drainage pipes run in the same trench in a modern villa?

No, the lines must be separated by a safe distance of at least one metre horizontally or 30 centimetres vertically to prevent cross-contamination if leaks occur.

How do you handle underground and roof tanks in the same villa?

We run separate fresh water lines from the underground tank to all points, with lift pipes to the roof during the first pour, and install isolation and safety valves on each tank.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works