First-fix plumbing in Salmiya demands precision routing to ground shops and upper apartments on narrow plots. We lay separate water and drain lines before walls close, ensuring straightforward maintenance later.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salmiya plots are narrow, often fifteen metres wide or less, and buildings can reach eight storeys or more. This means the plumbing routes need controlled vertical runs within columns and load-bearing walls, with clear separation of cold water, hot water and drainage. Cold supply runs from the pump chamber below, hot water from a central heater or unit-level tank, and drainage collects in a vertical riser before treatment.

Salmiya is in Hawalli governorate on the Gulf coast, where residential and commercial buildings cluster densely near Gulf Road.

Cold and hot water pipes in residential buildings must be separated by at least fifteen centimetres to avoid heat transfer.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Salmiya

Call now
Can hot water be supplied from a central heater or from separate unit-level tanks?

Both options are feasible depending on the building design. The site engineer specifies the route, depth and diameter for each line based on unit count and expected demand. We lay the lines carefully before walls close to avoid cutting later.

How do you separate the drainage network from cold and hot water in a narrow plot?

We segment the runs vertically and horizontally per the engineering drawings. Drainage passes through larger-diameter horizontal pipes with slope, while water runs through smaller, pressure-rated pipes. Each network has its designated path in walls and floors.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works