First-fix plumbing, new houses in Kuwait - Salwa

First-fix plumbing, new houses in Salwa

First-fix plumbing in Salwa focuses on distributing water and drainage in standalone villas and small apartment blocks on regular plots. The area contains varied residential buildings ranging from single-storey to three-storey structures.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salwa plots are medium-sized, roughly 30 metres deep and 20 metres wide, with a mix of villas and small apartment blocks of two or three units each. Villas typically need a simple central drainage network, while small blocks need separate water and drain circuits for each flat. We account for the fact that some older Salwa villas use different pipe grades, so we check compatibility before any connection or extension work.

Salwa sits in Hawalli governorate near Mishref Park, a residential district of coexisting villas and small apartment blocks.

Main water pipes for the area are typically buried one metre below street level.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Salwa

Call now
How do we separate services for units in a three-unit small apartment block?

We install a separate water meter and independent drain line for each flat from the main distribution chamber. Each unit gets its own isolation point for repairs or maintenance.

Do you handle drain network extensions in older villas?

Yes, we inspect existing pipe grades and current slopes before any extension. If old pipes are incompatible grades, we replace them entirely from the first connection point.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works