First-fix plumbing, new houses in Kuwait - Mahboula

First-fix plumbing, new houses in Mahboula

First-fix plumbing in Mahboula begins with understanding plot layout and fixture spacing. We run supply and drain lines before walls close and floors finish, respecting municipality-approved setbacks and gradients.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mahboula has low-rise residential villas on medium-sized plots, along with some shorter apartment blocks. Most projects need clear separation between internal water supply and drain and vent lines, especially in kitchens and bathrooms. We maintain drain line depth below finished floors and foundations, and ensure a minimum 1 in 100 gradient slope for smooth discharge without standing water.

Mahboula is in Ahmadi governorate, a residential area on the Gulf waterfront near Beach Road.

Main drain lines in Mahboula require a minimum 1 in 100 slope to ensure smooth drainage and natural venting.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Mahboula

Call now
How do we prevent water pooling in drain lines on a level plot?

We locate the main drainage collection point at the plot's lowest point and run lines at a constant minimum 1 in 100 slope toward the public network. We raise cleanouts and sumps as needed to achieve the required gradient.

Can we run water and drain pipes through the same load-bearing wall?

No, the municipality clearly separates clean water and drain routes. We typically run water in lightweight interior walls or column pockets, and drains in exterior walls or isolated channels beneath floor slabs.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works