
First-fix plumbing, new houses in Khitan Al-Jadida
First-fix plumbing in Khitan Al-Jadida starts with laying pipes before pouring and building, with precise distribution of water and drain points. The area focuses on modern apartment buildings requiring sanitary networks calibrated to current standards.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Khitan Al-Jadida is a new residential zone with stable base and modern buildings of 6 to 8 storeys on standard plots of around 40 metres. Pipes run inside building walls and floors in a coordinated vertical and horizontal layout, with clear separation between cold water, hot water and sewage networks. Each residential unit needs independent water meters and regular inspection points to ease future maintenance and repairs.
Khitan Al-Jadida is in Farwaniya governorate as a recently developed residential zone with uniform building standards.
Pipes inside walls must be at least 5 centimetres from the outer surface to protect against moisture and weather impacts.

What the first-fix covers
Supply and drain lines to every fixture point, set before walls close and floors are finished.

First-fix plumbing and electrics
Coordinating pipe and conduit routes before walls and ceilings are closed.

Bathroom first-fix plumbing
Precise stub-outs for toilet, basin, shower and bidet supply and drain.

Kitchen first-fix plumbing
In-wall supply and drain stubs for sink, dishwasher and fridge supply.

First-fix drainage
uPVC drain runs laid at correct gradients with access cleanouts.

Apartment first-fix plumbing
Full first-fix for multi-unit buildings with individual isolation per apartment.

Pressure test and handover
Supply network held under pressure before walls are plastered and signed off.
How it works.
Call or whatsApp
Send drawings and current build stage for an initial quote.
Site visit
Engineer visits, reviews drawings and counts all required outlet points.
Pipe installation
PPR supply and uPVC drain runs laid with all stub-outs secured.
Pressure test
Supply network tested under pressure before walls are plastered.
Handover
Stub-out layout drawing handed over to the finishing team.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for First-fix plumbing, new houses
Other services in Khitan Al-Jadida
Questions about First-fix plumbing, new houses in Khitan Al-Jadida
Call nowHow do you run pipes in walls between different residential units?
We run pipes in shared walls with clear separation between each unit's network, use acoustically insulated pipes to reduce noise, and place warning labels on drawings for future maintenance staff.
What timeframe is needed between pipe testing and closing walls and floors?
We pressure-test pipes for at least 24 hours before any closing, and document results in an official certificate reviewed by the site engineer.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps