First-fix plumbing, new houses in Kuwait - Khitan Al-Jadida

First-fix plumbing, new houses in Khitan Al-Jadida

First-fix plumbing in Khitan Al-Jadida starts with laying pipes before pouring and building, with precise distribution of water and drain points. The area focuses on modern apartment buildings requiring sanitary networks calibrated to current standards.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khitan Al-Jadida is a new residential zone with stable base and modern buildings of 6 to 8 storeys on standard plots of around 40 metres. Pipes run inside building walls and floors in a coordinated vertical and horizontal layout, with clear separation between cold water, hot water and sewage networks. Each residential unit needs independent water meters and regular inspection points to ease future maintenance and repairs.

Khitan Al-Jadida is in Farwaniya governorate as a recently developed residential zone with uniform building standards.

Pipes inside walls must be at least 5 centimetres from the outer surface to protect against moisture and weather impacts.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Khitan Al-Jadida

Call now
How do you run pipes in walls between different residential units?

We run pipes in shared walls with clear separation between each unit's network, use acoustically insulated pipes to reduce noise, and place warning labels on drawings for future maintenance staff.

What timeframe is needed between pipe testing and closing walls and floors?

We pressure-test pipes for at least 24 hours before any closing, and document results in an official certificate reviewed by the site engineer.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works