First-fix plumbing, new houses in Kuwait - Faiha

First-fix plumbing, new houses in Faiha

First-fix plumbing in Faiha starts by routing supply and drain lines beneath the foundation slab before concrete is poured. We run lines to every fixture point, then pressure-test and check for leaks before walls are closed in.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha has detached villas on medium-sized plots and some low-rise residential buildings. Most newer homes need separate plumbing runs for kitchens, bathrooms and exterior wash areas, and drainage lines for black water and grey water must be kept separate under municipality codes. In older villas, we survey the existing foundation to ensure we can route pipes without cutting into the slab.

Faiha is in Capital governorate, a quiet residential neighbourhood of detached villas and green spaces near Faiha Park.

Copper and reinforced plastic pipes are typically laid 45 to 60 centimetres below the final floor level.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Faiha

Call now
How do you separate the fresh water line from the black water drainage?

We run fresh water lines in a separate route from drainage pipes, maintaining approved horizontal and vertical spacing set by the municipality. We use rated copper or PVC plastic pipes and pressure-test before covering.

Can pipe routes be changed after the walls are closed?

It is very difficult and costly. That is why we test all routes and joints during the first-fix stage and create detailed route maps before concrete and masonry work begins.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works