First-fix plumbing, new houses in Kuwait - Yarmouk

First-fix plumbing, new houses in Yarmouk

First-fix plumbing in Yarmouk starts by laying water and drain lines before walls and floors close. The area has multi-storey apartment blocks and older villas needing precise network separation between units.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Yarmouk is a densely built residential area mixing older buildings of three to four storeys with villas on medium-sized plots. Most newer buildings there require separate plumbing networks for each residential unit with independent water meters. The thick clayey soil in the area affects the depth of main connections and the slopes needed for drainage, so we must survey pipe routes carefully before any pour.

Yarmouk is in the Capital governorate, a residential district near Yarmouk Sports Club and Yarmouk Co-op.

Municipality standards require a minimum 1 in 100 slope for all drainage lines on residential plots.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Yarmouk

Call now
How do we separate water and drain networks between flats in one building?

We run separate plumbing lines from the main tank to each flat with an independent water meter, and organise drainage routes for each unit so they do not mix before reaching the public network.

Does the clayey soil in Yarmouk affect the depth of main supply pipes?

Yes, the thick soil requires deeper trenching for main connections to avoid surface disturbance damage, and we check old service maps to avoid crossing electrical and gas lines.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works