
What sets this area apart
Daiya projects consist mainly of residential blocks four to eight storeys high on separated plots with good spacing between buildings. Each apartment needs cold and hot water points for kitchen and bathrooms, plus an independent drain network. The wider spacing between buildings allows easier routing of vertical and horizontal pipe runs and reduces complex interactions between adjoining units. We routinely pressure-test before the final slab and plastering.
Daiya sits in Capital governorate, a district of residential blocks and parks near the British School of Kuwait.
Daiya's drainage systems require precise fall gradients to ensure water flows toward the neighbourhood's main sewers.

What the first-fix covers
Dedicated cold and hot supply points plus drain branches for each apartment, isolated and tested.

Cold supply runs
PPR pipe from the apartment riser to every cold outlet point.

Insulated hot supply
PPR hot runs fully sleeved with closed-cell foam inside wall chases.

Drain branch layout
uPVC swept branches from each fixture point to the vertical stack.

Per-apartment isolation
Isolation valve per apartment so one unit can be shut off independently.

Stub-out heights and offsets
Every supply and drain stub set to fixture drawing dimensions before screed.

Pressure test and handover
Documented pressure test per apartment before plastering, with a route record.
How it works.
Call or whatsApp
Share apartment drawings, floor count and current construction stage for an initial assessment.
Site visit
Inspect wall chases, stack positions and planned fixture outlet locations on site.
Quotation and spec
Detailed quote listing pipe grades, fittings, insulation scope and isolation valve positions.
First-fix execution
Lay all supply and drain lines to exact heights and offsets from fixture drawings.
Test and handover
Pressure test each apartment and hand over a pipe-route record before plastering starts.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Apartment first-fix plumbing
Other services in Daiya
Questions about Apartment first-fix plumbing in Daiya
Call nowDo you test each apartment separately before finishing?
Yes, we pressure-test each apartment independently from other units before plastering and painting. This ensures no leaks exist at water and drain points.
How do you handle hot water points in apartments?
We run separate copper pipes for hot water from the central boiler or heater to each point in the apartment. We test the lines with cold water first, then hot water before walls close.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps