First-fix plumbing, new houses in Kuwait - Abu Halifa

First-fix plumbing, new houses in Abu Halifa

First-fix plumbing in Abu Halifa covers supply and drain lines to every fixture point before walls close. We lay copper and plastic pipes to the approved municipal drawings, and pressure-test before the final pour.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abu Halifa has medium-rise residential blocks of 4 to 6 storeys on moderate-depth plots, and newer buildings require clear separation of cold water, hot water and drain lines. Pipes run horizontally beneath floors and slabs to municipality depth standards, and any crossing of load-bearing members needs consultant approval. We pressure-test each network at 10 bar for two hours before covering, because any leak after the pour means breaking concrete.

Abu Halifa lies in Ahmadi governorate, home to Abu Halifa housing co-operative, a zone of concentrated residential construction.

Drain lines are laid at a minimum fall of 1.5 per cent to ensure proper discharge.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Abu Halifa

Call now
How do you separate hot and cold water in a single apartment?

We run two separate lines from the meter: one for cold water and one for hot water connected to a central or unit heater. Each network has independent isolation valves and pipes at standard diameter matching the fixture points.

What testing is required before walls and floors are closed?

Full pressure test of all water lines at 10 bar for two hours, and visual inspection of drain and vent lines. We document each test in a report signed by the supervisor before moving to the next phase.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works