Central gas first-fix in Kuwait - Hateen

Central gas first-fix in Hateen

Gas first-fix in Hateen precedes wall closure in mid-rise residential buildings. We run copper piping from the main meter to each unit with safety stops and isolation valves at set levels.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen has mid-rise residential blocks of six to ten storeys on medium-sized plots, mostly built in the last two decades. Each unit needs a separate gas branch from the main with an individual meter, and lines run through prepared interior walls and chases before concrete pour. We fit copper piping at three-quarter and one-third inch diameter per load, then pressure-test at 1.5 bar before handover to finishing works.

Hateen lies in Hawalli governorate, a residential district of medium-height apartment blocks near the area centre.

Network pressure test standard is 1.5 bar held for 15 minutes before wall closure.

Back to Central gas first-fix

See also: Central gas lines in Hateen

What the first-fix covers - Central gas first-fix

What the first-fix covers

We lay the complete gas network infrastructure before finishing works begin

  • Network survey and layout

    Pipe routes and network sizing confirmed before any chase cutting

  • Copper pipe installation

    Pipes run in wall chases and secured with silver-alloy brazed joints

  • Isolation valves

    One isolation valve per outlet point for independent shut-off

  • Air pressure test

    Compressed air held under gauge before any appliance connection

  • Appliance outlet points

    Each stub-out positioned at the exact height each appliance requires

  • As-built route drawings

    Every buried route dimensioned and handed to the owner at completion

How it works.

  1. Call or whatsApp

    Describe the project and book a site visit by call or WhatsApp

  2. Site visit

    Engineer visits, maps routes and counts all outlet points needed

  3. Quote and approval

    A priced quote with a draft network layout is submitted for approval

  4. Installation and testing

    Copper runs are installed and air-pressure tested before walls are closed

  5. Handover and drawings

    Owner receives as-built route drawings and the pressure test result record

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Central gas first-fix in Hateen

Call now
How many separate gas branches run in the apartment block?

Each unit has its own separate branch from the main line with an individual meter and isolation valve. The number of branches equals the number of residential units in the building.

Where do gas pipes run before walls close in Hateen?

Pipes run through interior walls and prepared chases during the concrete pour, with safety stops and isolation valves at each floor level. We pressure-test the full system before handover to finishing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works