Central gas first-fix in Kuwait - Hassawi

Central gas first-fix in Hassawi

Gas first-fix in Hassawi focuses on attached residential and commercial units on height-limited plots. We install pipe runs and fittings carefully before interior works and finishing begin.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hassawi is a mixed residential-commercial district of attached buildings at three to four storeys mostly, each commercial or residential unit having a separate gas meter and independent shutoff valve. The network starts at the main connection point then branches vertically through a central riser or service wall before splitting horizontally to each unit. Clear separation of gas, electrical and water lines is essential for safety code compliance, and we pressure-test each branch above operating load before handover.

Hassawi sits in Farwaniya governorate, a district of attached medium-rise residential and commercial buildings.

Every residential or commercial unit gets a separate gas meter with an independent shutoff valve before the final pour.

Back to Central gas first-fix

See also: Central gas lines in Hassawi

What the first-fix covers - Central gas first-fix

What the first-fix covers

We lay the complete gas network infrastructure before finishing works begin

  • Network survey and layout

    Pipe routes and network sizing confirmed before any chase cutting

  • Copper pipe installation

    Pipes run in wall chases and secured with silver-alloy brazed joints

  • Isolation valves

    One isolation valve per outlet point for independent shut-off

  • Air pressure test

    Compressed air held under gauge before any appliance connection

  • Appliance outlet points

    Each stub-out positioned at the exact height each appliance requires

  • As-built route drawings

    Every buried route dimensioned and handed to the owner at completion

How it works.

  1. Call or whatsApp

    Describe the project and book a site visit by call or WhatsApp

  2. Site visit

    Engineer visits, maps routes and counts all outlet points needed

  3. Quote and approval

    A priced quote with a draft network layout is submitted for approval

  4. Installation and testing

    Copper runs are installed and air-pressure tested before walls are closed

  5. Handover and drawings

    Owner receives as-built route drawings and the pressure test result record

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Central gas first-fix in Hassawi

Call now
How are gas lines separated between units in an attached building?

We run a vertical central riser through the service wall, from which independent horizontal branches extend to each unit with its own meter and shutoff valve. Each branch is separately pressure-tested.

What clearance is needed between gas and electrical lines in the same wall?

Minimum twenty centimetres horizontal separation. We enforce this from the start and document it in the inspection report before wall closure.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works