
Central gas first-fix in Anjafa
Gas first-fix in Anjafa precedes wall closure to ensure pipe and joint integrity. We run the gas network from the main meter through walls and floors using copper or galvanized steel pipes with full pressure testing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Anjafa is an older residential district with five to eight-storey apartment blocks and small to medium units, already fitted with electricity, water and drainage systems in the walls. Gas line routing here demands separate paths from electrical pipes at least 30 cm apart in external and internal walls, avoiding direct crossover with drainage pipes. Most units are older stock partially refurbished, so we clean walls first before running and securing pipes with approved metal brackets.
Anjafa lies in Hawalli governorate, an older residential neighbourhood with mid-rise apartment buildings.
The minimum clearance between gas and electrical pipes in walls is 30 cm, per municipality specifications.

What the first-fix covers
We lay the complete gas network infrastructure before finishing works begin

Network survey and layout
Pipe routes and network sizing confirmed before any chase cutting

Copper pipe installation
Pipes run in wall chases and secured with silver-alloy brazed joints

Isolation valves
One isolation valve per outlet point for independent shut-off

Air pressure test
Compressed air held under gauge before any appliance connection

Appliance outlet points
Each stub-out positioned at the exact height each appliance requires

As-built route drawings
Every buried route dimensioned and handed to the owner at completion
How it works.
Call or whatsApp
Describe the project and book a site visit by call or WhatsApp
Site visit
Engineer visits, maps routes and counts all outlet points needed
Quote and approval
A priced quote with a draft network layout is submitted for approval
Installation and testing
Copper runs are installed and air-pressure tested before walls are closed
Handover and drawings
Owner receives as-built route drawings and the pressure test result record
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Central gas first-fix
Other services in Anjafa
Questions about Central gas first-fix in Anjafa
Call nowHow do you avoid gas pipes crossing electrical wiring in older walls?
We route the pipes on separate horizontal and vertical paths with 30 cm spacing, using metal brackets to keep them clear of wiring. Before fixing, we clean the walls and locate existing pipes.
Do you test gas pipes before walls close?
Yes, we run a full pressure test on the network after all pipes and fittings are fixed and before plaster or tile work starts. Testing is done at specified air pressure and documented in the site report.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps