Rooftop annex in Kuwait - Fintas

Rooftop annex in Fintas

Rooftop annex construction in Fintas requires careful structural analysis of the existing slab before building. We verify the roof can carry the added load and design the annex to balance with the standing structure.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Fintas contains villas on multi-storey lots with reinforced concrete slabs from various eras. Before building a rooftop annex, we sample the concrete and analyse the span between columns and beams to calculate available live load. Some villas sit on weak soil needing extra reinforcement, which affects the annex height and outer wall thickness. We hand over the annex to the same quality standard as the main structure.

Fintas lies in Ahmadi governorate, a residential district near the beach and Fintas Co-op.

We check load distribution across the villa's four main columns before adding any weight to the roof.

Back to Rooftop annex

What the work covers - Rooftop annex

What the work covers

Design, structural check, build and full handover handled under one contract.

  • Rooftop annex design

    Approved drawings suited to the existing floor and municipality requirements.

  • Carrying slab check

    Engineering assessment of the existing slab before any work begins.

  • Rooftop structural shell

    Columns, beams and slab poured to the correct structural specification.

  • Slab junction waterproofing

    Full waterproofing seal at the old roof and new annex floor junction.

  • Staircase access

    Internal or external staircase connecting the annex to lower floors.

  • Full finishing

    Tiling, gypsum, aluminium, glass, paint, electrical and plumbing works.

How it works.

  1. Call or whatsApp

    Tell us the property location and annex requirements to begin.

  2. Site visit and check

    We visit, assess the carrying slab and check site access conditions.

  3. Design and permit

    Drawings prepared and municipality permit obtained before work starts.

  4. Construction

    Dowel fixing, column pour, block walls and finishes per approved drawings.

  5. Inspection and handover

    Waterproofing, drainage and electrical verified before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop annex in Fintas

Call now
How do we confirm the roof can bear the annex weight, furniture and occupants?

We take precise measurements of slab thickness and concrete quality and calculate the permitted live load per building code. We provide a signed engineer's report before any construction starts.

Does the annex need extra foundations on the roof or does it rest on the existing slab?

It rests on the existing slab with load distribution through new columns that transfer weight to the villa's main columns. We do not dig new foundations in the roof.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works