Rooftop annex in Kuwait - Hadiya

Rooftop annex in Hadiya

Rooftop annex design in Hadiya depends on careful testing of soil type and existing concrete strength. We design the annex based on the original building's technical data and permitted loads.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hadiya is a residential zone near Ahmadi Town administrative centre, with villas of varied designs and concrete slabs of different thicknesses. The soil here is sandy with gravel layers, affecting the existing foundations and slab. Before building a rooftop annex we extract concrete samples and test them in the lab for strength and elasticity. Annexes here are usually bedrooms or lounges, so we add windows and natural ventilation per code.

Hadiya lies in Ahmadi governorate close to Ahmadi Town.

We test concrete samples with a compression machine to measure strength in megapascals before calculating live load capacity.

Back to Rooftop annex

What the work covers - Rooftop annex

What the work covers

Design, structural check, build and full handover handled under one contract.

  • Rooftop annex design

    Approved drawings suited to the existing floor and municipality requirements.

  • Carrying slab check

    Engineering assessment of the existing slab before any work begins.

  • Rooftop structural shell

    Columns, beams and slab poured to the correct structural specification.

  • Slab junction waterproofing

    Full waterproofing seal at the old roof and new annex floor junction.

  • Staircase access

    Internal or external staircase connecting the annex to lower floors.

  • Full finishing

    Tiling, gypsum, aluminium, glass, paint, electrical and plumbing works.

How it works.

  1. Call or whatsApp

    Tell us the property location and annex requirements to begin.

  2. Site visit and check

    We visit, assess the carrying slab and check site access conditions.

  3. Design and permit

    Drawings prepared and municipality permit obtained before work starts.

  4. Construction

    Dowel fixing, column pour, block walls and finishes per approved drawings.

  5. Inspection and handover

    Waterproofing, drainage and electrical verified before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop annex in Hadiya

Call now
Does the annex need municipality approval before building in Hadiya?

Yes, we submit architectural drawings and an engineer's report to the municipality. Approval typically takes two weeks after submitting the complete file.

What is the expected duration to build a rooftop annex on a Hadiya villa?

Usually two months from the municipality approval date, including excavation, pouring, waterproofing and basic finishing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works