
Screed pouring in Qibla
Screed pouring in Qibla demands precision across diverse buildings from commercial towers to residential blocks. We pour concrete levelling layers at correct slopes to ensure water drainage and stability before final finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Qibla contains multi-storey apartments, shops and office towers on varied plot sizes. Many of these buildings are older, meaning original floors may be uneven or damaged. When we pour screeds we inspect the existing structure and lay a levelling coat at varying thickness to achieve at least 1:1000 slope toward water outlets or pitched surfaces. Portland cement, clean sand and potable water are essential, and we wait for full curing before any top finishing begins.
Qibla lies in Kuwait governorate, a zone of adjoining commercial and residential buildings near Gulf Road and the central district.
Screeds typically need 3 to 7 days before foot traffic, depending on layer thickness and ambient temperature.

What screed work covers
Screed for floors and surfaces at any stage of construction or renovation

Ground-floor screed
Level bed over the ground slab before floor finishing is laid

Upper-floor screed
Consistent-thickness screed over suspended slabs on each storey

Falls and levelling screed
Creating precise falls toward drains in bathrooms, kitchens and roofs

Wet-area screed
Moisture-tolerant screed shaped to accommodate drainage gradients

Post-demolition screed
Re-levelling floors after partial demolition or strip-out of old finishes

Extension and annex screed
Levelling annex floors to match the finished level of the existing building
How it works.
First contact
Call or WhatsApp us describing the floor area and the work needed
Site inspection
Team visits to measure the area, assess the surface and confirm thickness
Quote and approval
You receive a detailed quote and we start once you approve it
Preparation and pouring
Surface cleaned, screed poured and levelled with required falls achieved
Curing and handover
Layer is wetted and covered to prevent cracking then handed over ready for finishing
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Screed pouring
Other services in Qibla
Questions about Screed pouring in Qibla
Call nowHow do you handle old, uneven floors before pouring screed?
We inspect the existing floor and set the level reference using benchmarks and walls. We pour a screed 3 to 10 cm thick with correct slope toward drainage points.
How long must we wait before starting work on the new floor?
The screed needs full curing of 3 to 7 days, depending on thickness and site temperature. We advise against heavy loads during this period.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps