Screed pouring in Kuwait - Qibla

Screed pouring in Qibla

Screed pouring in Qibla demands precision across diverse buildings from commercial towers to residential blocks. We pour concrete levelling layers at correct slopes to ensure water drainage and stability before final finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qibla contains multi-storey apartments, shops and office towers on varied plot sizes. Many of these buildings are older, meaning original floors may be uneven or damaged. When we pour screeds we inspect the existing structure and lay a levelling coat at varying thickness to achieve at least 1:1000 slope toward water outlets or pitched surfaces. Portland cement, clean sand and potable water are essential, and we wait for full curing before any top finishing begins.

Qibla lies in Kuwait governorate, a zone of adjoining commercial and residential buildings near Gulf Road and the central district.

Screeds typically need 3 to 7 days before foot traffic, depending on layer thickness and ambient temperature.

Back to Screed pouring

See also: Rebar & concrete pouring in Qibla

What screed work covers - Screed pouring

What screed work covers

Screed for floors and surfaces at any stage of construction or renovation

  • Ground-floor screed

    Level bed over the ground slab before floor finishing is laid

  • Upper-floor screed

    Consistent-thickness screed over suspended slabs on each storey

  • Falls and levelling screed

    Creating precise falls toward drains in bathrooms, kitchens and roofs

  • Wet-area screed

    Moisture-tolerant screed shaped to accommodate drainage gradients

  • Post-demolition screed

    Re-levelling floors after partial demolition or strip-out of old finishes

  • Extension and annex screed

    Levelling annex floors to match the finished level of the existing building

How it works.

  1. First contact

    Call or WhatsApp us describing the floor area and the work needed

  2. Site inspection

    Team visits to measure the area, assess the surface and confirm thickness

  3. Quote and approval

    You receive a detailed quote and we start once you approve it

  4. Preparation and pouring

    Surface cleaned, screed poured and levelled with required falls achieved

  5. Curing and handover

    Layer is wetted and covered to prevent cracking then handed over ready for finishing

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Screed pouring in Qibla

Call now
How do you handle old, uneven floors before pouring screed?

We inspect the existing floor and set the level reference using benchmarks and walls. We pour a screed 3 to 10 cm thick with correct slope toward drainage points.

How long must we wait before starting work on the new floor?

The screed needs full curing of 3 to 7 days, depending on thickness and site temperature. We advise against heavy loads during this period.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works