Farm wall construction in Kuwait - Hateen

Farm wall construction in Hateen

Farm wall construction in Hateen requires deep footings in sandy soil and solid concrete foundations. We begin by setting the boundary according to the municipality permit, then build a reinforced wall with final render finish.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen plots are more spacious than central areas and sit on sandy soil requiring deep digging down to 80 cm to ensure stable concrete foundations. Walls here typically reach 200 cm height and need full reinforcement mesh and cement render finish to resist moisture and cracking. The sandy soil means we place a compacted gravel layer directly under the base to improve drainage and prevent settlement.

Hateen is located in Hawalli governorate and comprises spaced residential areas with wider plots than central districts.

We apply a minimum foundation depth of 80 cm in sandy soil to prevent wall settlement.

Back to Farm wall construction

See also: Farm & rest-house construction in Hateen

What the wall work covers - Farm wall construction

What the wall work covers

From setting out the boundary and digging footings through to a finished, rendered wall.

  • Boundary setting out

    Marking the exact wall line on site before any digging starts.

  • Footing excavation

    Digging footings to the correct depth for the actual soil type.

  • Concrete footing pour

    Pouring reinforced, sulphate-resistant concrete with vertical rebar stubs.

  • Block wall construction

    Laying block courses with strong mortar and accurate vertical alignment.

  • Render and external finish

    External render coat protecting the block from moisture and blown dust.

  • Gates and entry openings

    Forming gate openings and setting anchor plates to the required dimensions.

How it works.

  1. Call or whatsApp

    Contact us and share the plot location and approximate wall length.

  2. Site visit

    We visit to assess soil conditions and confirm the actual wall alignment.

  3. Quotation

    We provide a detailed quote covering footings, block, render and gate openings.

  4. Construction and pour

    Footing dig, concrete pour, block laying, then external render coat.

  5. Handover and check

    We inspect alignment and finish with you before the job is closed.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Farm wall construction in Hateen

Call now
How deep do we dig the footing in Hateen's sandy soil?

We dig at least 80 cm, then place compacted gravel before pouring the concrete base to improve stability and drainage.

Does a single wall need reinforcement on both sides or one side?

The wall needs full reinforcement mesh distributed across its entire thickness to resist cracking and lateral pressures from backfill and weather.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works