Sandwich-panel rooms in Ahmadi Stables
Complete insulated rooms built fast on roofs of Ahmadi Stables structures, from slab prep through steel frame, panel fixing and openings. We hand over a finished, ready-to-use room without delay.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Ahmadi Stables features service buildings and animal shelters with level, load-bearing roofs. Building an insulated room on these roofs requires first checking and, if needed, strengthening the existing structure, then pouring a thin concrete levelling slab with proper drainage. Sandwich panels deliver fast thermal insulation; their installation is constrained by the height of existing openings and tight clearances between buildings.
Ahmadi Stables lies in Ahmadi governorate, a specialist facility for horsemanship and racing.
The concrete slab is poured at minimum 10 cm thickness to ensure stability and drainage over the existing roof.
See also: Cold-steel / sandwich-panel annex in Ahmadi Stables

What the work covers
Base slab preparation through frame erection, panel fixing, openings and final handover.

Base preparation
Levelling the slab and fixing a concrete or steel base curb.

Cold-steel frame
Galvanised cold-formed columns and beams fixed at standard centres.

Wall and roof panels
Cut-to-size sandwich panels fixed to the frame with self-drilling screws.

Door and window openings
Steel subframes built into the frame with metal flashing and sealed perimeters.

AC and service sleeves
Sealed metal sleeves for split-AC heads, power cables and any drainage.

Joint sealing and handover
All panel joints sealed with UV-resistant silicone before the room is handed over.
How it works.
First contact
Call or WhatsApp us to arrange a site visit at your convenience.
Site assessment
We measure the area, check the slab and note all opening requirements.
Quotation
A detailed offer covering panels, frame, openings and all sealing work.
Fabrication and installation
Panels are cut to size; frame, panels and openings are installed on site.
Inspection and handover
We test all joints and seals, then hand the room over ready for use.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Sandwich-panel rooms
Other services in Ahmadi Stables
Questions about Sandwich-panel rooms in Ahmadi Stables
Call nowCan the stable roof support the weight of a new insulated room?
We inspect the roof's load-bearing structure first. If expected loads exceed limits, we strengthen the supports and beams before pouring the base slab and starting assembly.
How long until the room is ready to use?
After the slab sets, frame assembly, panel fixing and openings take two to three weeks. Handover includes the room with flooring, walls and fully insulated roof ready to use.