Cement-board annex in Kuwait - Shuaiba Industrial

Cement-board annex in Shuaiba Industrial

Cement-board annexes in Shuaiba Industrial serve office, storage and admin facilities built on expansive industrial plots. We frame and panel quickly, with durable interior finishes suited to the industrial environment.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Industrial facilities in Shuaiba need flexible, fast-turnaround workspaces, and cement-board annexes provide a lightweight solution that does not overload existing foundations. The panels withstand humidity and daily thermal swings in the area and allow service routing without structural cutting. Light framing and panel installation run in parallel with ongoing neighbouring industrial operations, minimizing production downtime.

Shuaiba Industrial sits in Ahmadi governorate, a petrochemical manufacturing, storage and logistics services zone anchored by the KIPIC complex.

Approved cement-board panels withstand relative humidity up to 95 percent without structural warping.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Shuaiba Industrial

Call now
Will a cement-board annex handle the climate swings in Shuaiba Industrial?

Yes. The panels resist moisture, heat, and seasonal expansion and contraction. We use cross-ventilation and standard expansion joints to ensure frame stability.

How long does it take to build a complete cement-board annex with interior finishing?

Usually 4 to 6 weeks depending on annex size and service scope. Panels install quickly and interior finishing runs in parallel, cutting total duration.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works