Cement-board annex in Kuwait - Fintas

Cement-board annex in Fintas

A cement-board annex in Fintas suits coastal villas and homes needing a light, durable extra room. We install the frame, panels and finished interior complete according to the municipality-approved drawings.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Fintas plots are detached villas and townhouses on moderate-sized land with gardens, and expansions are usually extra wings or annexed rooms on the side or rear. The light cement-board frame suits these additions because it does not overload existing foundations and needs no deep excavation. We mount panels on timber or metal framing with moisture sealing on the exterior and cement-board interior finish with paint to spec.

Fintas lies in Ahmadi governorate, a coastal residential area dominated by detached villas and houses near the co-op and beach.

A single annex is typically one to two storeys depending on available space and the parent villa's municipal permit.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Fintas

Call now
Can a cement-board annex handle the salt air and moisture in Fintas?

Yes, but we install an exterior moisture barrier of polyethylene or breathable membrane before the outer finish, and clear gaps between panels of water before full sealing.

How long does it take to build a single-room cement-board annex?

Usually four to six weeks, depending on room size and interior finish type approved by municipality, including frame, panels, paint and flooring.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works