Cement-board rooms in Kuwait - Ardhiya

Cement-board rooms in Ardhiya

Cement-board rooms in Ardhiya offer a quick and secure way to expand residential space on medium plots near the industrial zone. Construction uses a tight steel frame, insulated walls and complete services.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ardhiya has small apartment buildings and family villas on medium plots, and many owners need an extra annex to house a growing family or rent it out. Proximity to the industrial zone means the plot foundation may be damp occasionally, so we ensure surface drainage and proper runoff before frame installation. Cement board walls provide a strong barrier against moisture and external elements, and air-conditioning, electrical and plumbing runs are completed immediately after wall closure.

Ardhiya is in Farwaniya governorate and near the industrial zone and highway.

Cement-board rooms in Ardhiya must match the height of the existing villa or building, usually 3 to 3.8 metres from ground level.

Back to Cement-board rooms

See also: Cement-board annex in Ardhiya

What the work covers - Cement-board rooms

What the work covers

Delivering a complete cement-board room from steel frame through finishes and services

  • Cement-board panels

    Exterior-grade moisture-resistant panels fixed with self-drilling screws

  • Cold-steel framing

    Galvanised steel sections sized to engineering requirements

  • Thermal insulation

    Rigid insulation board in the wall cavity to block intense heat

  • Joint and edge sealing

    Flexible sealant on every joint and edge against water and dust

  • Interior finishing

    Plaster, paint or tiling to the owner's chosen specification

  • Electrical and AC works

    Electrical conduit and correctly formed AC sleeve through the wall panel

How it works.

  1. First contact

    Call or WhatsApp us to describe the site and required room size

  2. Site survey

    We visit to measure the space and check the existing slab or roof condition

  3. Quote and layout

    We submit a detailed price offer with a layout showing the room and openings

  4. Construction

    Steel frame, panels, insulation, finishes and services installed in correct sequence

  5. Handover and check

    We check joint sealing, earthing and AC fitment before handing over the key

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board rooms in Ardhiya

Call now
Can a cement-board room handle moisture and poor drainage in Ardhiya?

Yes, because cement board itself is moisture-resistant and cleanable. Before building we check plot surface drainage and lay proper foundations to prevent groundwater seepage into the base.

How long does it take to build a cement-board room without delaying the last two stages?

Duration depends on room size and service complexity, but we complete frame, walls, ceilings and services in one continuous schedule. Handover occurs when the room is ready for occupancy without waiting.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works