Stone boundary wall in Kuwait - Abbasiya

Stone boundary wall in Abbasiya

Stone boundary walls in Abbasiya mark residential villas on medium-sized plots in a dense residential area. We select stone and mortar carefully to suit mixed soil and pressure from neighbouring buildings.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya villas sit on medium plots with standard setbacks from the street, and plots are fairly close together. Soil here is mixed sand and clay, requiring careful study before footing excavation. The stone wall must withstand lateral pressure from neighbouring walls and land. We select strong mortar and ensure good ventilation and drainage to prevent footing moisture.

Abbasiya lies in Farwaniya governorate, a residential district of villas on medium-sized, closely-spaced plots.

We test the mixed soil type before setting footing depth, which may reach 80 cm on some plots.

Back to Stone boundary wall

See also: Boundary walls & gates in Abbasiya

What the work covers - Stone boundary wall

What the work covers

Stone wall construction handled start to finish, footing to coped top

  • Footing excavation

    Trench dug and reinforced concrete footing cast at adequate depth

  • Tie columns

    Reinforced concrete columns cast at regular intervals to brace the wall

  • Stone coursework

    Stone courses laid in level beds with durable cement mortar

  • Foundation waterproofing

    Waterproof membrane at footing level to protect stone from soil salinity

  • Coping course

    Concrete or stone coping with slight fall to drain rainwater away

  • Gate openings

    Gate openings formed with reinforced concrete lintels and neat stone jambs

How it works.

  1. Call or whatsApp

    Tell us the plot location and approximate wall length needed

  2. Site visit

    We visit to measure boundaries, check soil type and confirm footing depth

  3. Quotation

    Detailed quote issued with stone type, quantities and execution items

  4. Excavation and build

    Trench excavated, footing cast, tie columns built, stone courses laid

  5. Finish and handover

    Coping fitted, stone face cleaned, wall handed over ready for gates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Stone boundary wall in Abbasiya

Call now
How do you handle mixed sand-and-clay soil in Abbasiya?

We test the soil and choose a footing depth suited to its type. We use mortar that resists seasonal expansion and contraction from moisture variation in mixed soil.

Can a stone wall handle pressure from neighbouring walls on adjacent plots?

Yes. We build the wall to sufficient thickness with deep footing, and allow a simple gap between it and the neighbouring wall to prevent pressure transfer and settlement.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works