Block boundary wall in Kuwait - Salhiya

Block boundary wall in Salhiya

Boundary block walls in Salhiya protect residential and commercial plots from encroachment and visual seepage. We measure the legal boundaries, lay the blocks with reliable mortar, then apply render coats and finish the surface.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salhiya contains a mix of residential and medium to small commercial plots, many at street intersections on major thoroughfares. This means the boundary wall is exposed to damage from vehicle traffic and may encounter shallow foundations of nearby older buildings. We verify the municipality survey plan to pinpoint the boundary precisely, build the foundation at sufficient depth to anchor the blocks and prevent settlement, and await municipality approval of the wall location before starting the pour.

Salhiya is in the Capital governorate, home to Salhiya Commercial Complex and several premium hotels.

The standard boundary wall height in Salhiya is three metres at 20 centimetre thickness, with a foundation trench 0.5 metres below ground level.

Back to Block boundary wall

See also: Block walls in Salhiya

What the work covers - Block boundary wall

What the work covers

Full execution of the perimeter boundary wall from layout marking to finished render.

  • Boundary layout

    Mark the plot boundary accurately before any excavation begins.

  • Footing excavation and pour

    Excavate and pour the strip footing at depth suited to local soil.

  • Foundation waterproofing

    Apply a damp-proof course to block salt and moisture rise into blockwork.

  • Block laying

    Lay block courses plumb and level with bed-joint mesh reinforcement.

  • Reinforced columns and ties

    Cast reinforced concrete columns along the wall to resist lateral loads.

  • Render and finish

    Render both faces smooth and ready for paint or stone cladding.

How it works.

  1. First contact

    Call or WhatsApp us to describe your plot and arrange a site visit.

  2. Site survey

    We visit to measure the perimeter, assess soil and set the footing depth.

  3. Quotation

    A detailed quote is submitted covering quantities, materials and method.

  4. Construction

    Footing pour, block laying, column casting and render in sequence.

  5. Handover

    We inspect plumb, level and finish with you before final sign-off.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Block boundary wall in Salhiya

Call now
How do you pinpoint the plot boundary before laying the wall?

We obtain the official survey plan from the municipality and use measuring poles and string lines to mark the boundary. We place concrete markers at corners and have the site engineer verify the layout before foundation trenching begins.

Is the wall protected against damage from vehicle traffic on the adjacent street?

We build a deep, strong foundation that prevents settlement and vibration transmission. Some plots near main streets may need additional protective barriers. We discuss this with the owner and site engineer before starting work.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works