Block boundary wall in Kuwait - Daiya

Block boundary wall in Daiya

The boundary block wall in Daiya surrounds quiet residential plots away from main thoroughfares. We execute each wall from ground marking and trenching through reinforced block pouring to mortar and paint finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya plots are generally larger in area than those elsewhere, and walls there protect open space and gardens from wind and sand. We use concrete block with horizontal reinforcement every three courses and vertical reinforcement at corners and openings, and account for lateral soil pressure since trenches can be deep in some cases. We seal moisture on the outer face and apply crack-resistant mortar before final finishing.

Daiya sits in Kuwait governorate near the British School of Kuwait and Daiya Park.

We dig the foundation trench to at least 600 mm depth to ensure wall stability on Daiya's non-uniform soil.

Back to Block boundary wall

See also: Block walls in Daiya

What the work covers - Block boundary wall

What the work covers

Full execution of the perimeter boundary wall from layout marking to finished render.

  • Boundary layout

    Mark the plot boundary accurately before any excavation begins.

  • Footing excavation and pour

    Excavate and pour the strip footing at depth suited to local soil.

  • Foundation waterproofing

    Apply a damp-proof course to block salt and moisture rise into blockwork.

  • Block laying

    Lay block courses plumb and level with bed-joint mesh reinforcement.

  • Reinforced columns and ties

    Cast reinforced concrete columns along the wall to resist lateral loads.

  • Render and finish

    Render both faces smooth and ready for paint or stone cladding.

How it works.

  1. First contact

    Call or WhatsApp us to describe your plot and arrange a site visit.

  2. Site survey

    We visit to measure the perimeter, assess soil and set the footing depth.

  3. Quotation

    A detailed quote is submitted covering quantities, materials and method.

  4. Construction

    Footing pour, block laying, column casting and render in sequence.

  5. Handover

    We inspect plumb, level and finish with you before final sign-off.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Block boundary wall in Daiya

Call now
Do you build walls at different heights on different sides of the plot?

Yes, based on municipality setbacks and the character of the adjacent space. We record the approved height for each side before trenching and pouring begins.

How do you protect the wall from wind and sand exposure in Daiya?

We apply crack-resistant mortar and fine plaster coat on the outside to block moisture and sand penetration. Some walls need additional protective paint depending on direction and exposure.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works