Block boundary wall in Kuwait - Rumaithiya

Block boundary wall in Rumaithiya

The block boundary wall in Rumaithiya protects spacious seaside villas and seafront plots in an upscale multi-level district. We mark boundaries precisely, study setbacks, pour foundations and lay salt-treated blockwork and finish with robust barrier coating.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Rumaithiya plots vary in size and elevation, mostly modern villas on part of the plot with expansive gardens, some with direct sea frontage. The soil is highly salt-saturated and constant sea winds carry salt spray. Standard blockwork deteriorates quickly, so we use coastal-grade treated blocks, sulphate and salt-resistant cement. We coat the wall with epoxy or very strong barrier paint and add top-edge drainage to shed water from the surface.

Rumaithiya sits in Hawalli governorate, an upscale residential area of deep seafront villas directly on the Gulf coast.

Rumaithiya coastal block walls require heavy-duty protective outer coating that needs periodic renewal due to high salt and sea winds.

Back to Block boundary wall

See also: Block walls in Rumaithiya

What the work covers - Block boundary wall

What the work covers

Full execution of the perimeter boundary wall from layout marking to finished render.

  • Boundary layout

    Mark the plot boundary accurately before any excavation begins.

  • Footing excavation and pour

    Excavate and pour the strip footing at depth suited to local soil.

  • Foundation waterproofing

    Apply a damp-proof course to block salt and moisture rise into blockwork.

  • Block laying

    Lay block courses plumb and level with bed-joint mesh reinforcement.

  • Reinforced columns and ties

    Cast reinforced concrete columns along the wall to resist lateral loads.

  • Render and finish

    Render both faces smooth and ready for paint or stone cladding.

How it works.

  1. First contact

    Call or WhatsApp us to describe your plot and arrange a site visit.

  2. Site survey

    We visit to measure the perimeter, assess soil and set the footing depth.

  3. Quotation

    A detailed quote is submitted covering quantities, materials and method.

  4. Construction

    Footing pour, block laying, column casting and render in sequence.

  5. Handover

    We inspect plumb, level and finish with you before final sign-off.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Block boundary wall in Rumaithiya

Call now
Is standard blockwork suitable for a boundary wall directly on the Rumaithiya coast?

No, standard blocks deteriorate quickly from salt. We use coastal-grade treated blocks, salt and sulphate-resistant cement and very strong protective outer coating.

How do you protect the block wall from ongoing coastal salt and moisture?

We use treated blocks, coat the wall with strong epoxy or heavy-duty barrier paint, and place top-edge and base drainage to shed salt water and divert brackish groundwater away.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works