Block boundary wall in Kuwait - Anjafa

Block boundary wall in Anjafa

Boundary wall construction in Anjafa requires precise height and thickness calculation to resist Gulf winds and sandy soil. We start with plot marking and deep footings, then raise the blockwork in lifts with vertical and level checks.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa plots are residential with medium sizes and perimeters ranging from 120 to 180 linear metres, with sandy soil and low moisture overall. The boundary wall here requires a footing starting 80 to 120 cm below ground level to support a 20 cm thick hollow concrete or solid blockwork wall, with a finished height of 150 to 180 cm above natural ground. The municipality sets strict standards for height and deviation; we inspect the footing before raising any block and fill internal voids with cement mortar.

Anjafa lies in Hawalli governorate on the eastern edge, where villas sit on enclosed plots bounded by perimeter walls.

Boundary walls in Anjafa must not be less than 150 cm nor exceed 180 cm in height per municipality bylaws.

Back to Block boundary wall

See also: Block walls in Anjafa

What the work covers - Block boundary wall

What the work covers

Full execution of the perimeter boundary wall from layout marking to finished render.

  • Boundary layout

    Mark the plot boundary accurately before any excavation begins.

  • Footing excavation and pour

    Excavate and pour the strip footing at depth suited to local soil.

  • Foundation waterproofing

    Apply a damp-proof course to block salt and moisture rise into blockwork.

  • Block laying

    Lay block courses plumb and level with bed-joint mesh reinforcement.

  • Reinforced columns and ties

    Cast reinforced concrete columns along the wall to resist lateral loads.

  • Render and finish

    Render both faces smooth and ready for paint or stone cladding.

How it works.

  1. First contact

    Call or WhatsApp us to describe your plot and arrange a site visit.

  2. Site survey

    We visit to measure the perimeter, assess soil and set the footing depth.

  3. Quotation

    A detailed quote is submitted covering quantities, materials and method.

  4. Construction

    Footing pour, block laying, column casting and render in sequence.

  5. Handover

    We inspect plumb, level and finish with you before final sign-off.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Block boundary wall in Anjafa

Call now
What footing depth suits sandy soil for a boundary wall in Anjafa?

Footing starts 80 to 120 cm below natural ground level, based on soil stability and geotechnical survey. We test the ground before excavation and widen the base for greater stability.

Do you fill the hollow cores of the blocks with cement mortar?

Yes, we inject internal voids with cement mortar to strengthen the wall and prevent water and moisture penetration. This is essential in sandy climates.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works