Plot sketch (kroki) in Kuwait - Qasr

Plot sketch (kroki) in Qasr

Accurate kroki sketches for Qasr are drawn from captured site data and submitted ready for the municipality permit file. We measure setbacks, frontages and plot depth, fix them in the drawing before filing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qasr plots in Jahra vary in size, from narrow residential parcels 20 to 25 metres deep to wider ones, many with older buildings on shallow foundations. The kroki must reflect the plot's actual boundaries and the setbacks required by the municipality based on land use; any measurement error means file rejection. We record every dimension directly on site and lock it into the final drawing before sending to the municipality.

Qasr sits in Jahra governorate, a residential area with plots of varying sizes and ages.

Qasr residential setbacks from the main street are usually 5 metres, and 1 metre minimum from side boundaries per the building code.

Back to Plot sketch (kroki)

See also: Architectural design & drawings in Qasr

What the kroki covers - Plot sketch (kroki)

What the kroki covers

Plot data is captured and the sketch is drawn ready for the permit file

  • Plot boundary lines

    All sides drawn to the exact registered dimensions

  • Required setbacks

    Setback distances marked per governorate zoning rules

  • Corner coordinates

    Corner points fixed with coordinates for precision

  • Street and entry position

    Main frontage and proposed entry point shown clearly

  • Permitted coverage ratio

    Buildable area calculated against the applicable zoning rules

  • Licensed engineer stamp

    Signed and stamped by a licensed engineer for official acceptance

How it works.

  1. First contact

    Call or WhatsApp us and share the plot number and block

  2. Document review

    We review the title deed and confirm plot data with the municipality

  3. Field survey

    Engineer visits site to measure boundaries and record actual coordinates

  4. Kroki drafting

    Kroki is drawn in AutoCAD with all setbacks and plot data shown

  5. Handover and stamp

    Licensed engineer signs and stamps the kroki, handed over print-ready

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Plot sketch (kroki) in Qasr

Call now
How do you ensure the kroki is accepted by the municipality on first submission?

We measure the site precisely and verify required setbacks by plot type and use before final drawing. We preview the file at the municipality office to catch any document gaps before formal submission.

Do you handle older Qasr plots with shallow foundations?

Yes, we record existing foundations and standing structures in the kroki if the plot is occupied. This helps the designer later and clarifies the site condition to the municipality.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works