House plans by plot size in Kuwait - Fintas

House plans by plot size in Fintas

Plot-based planning in Fintas starts by measuring your actual land and converting it into an approved drawing ready for licensing. We read the plot dimensions, set-backs and nearby coastal restrictions, then draw the boundaries and internal spaces under area rules.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Fintas is a coastal and medium-density residential district with villas on plots between 700 and 1200 square metres, some near the beach and some set back. Each plot has defined set-backs from the street and side boundaries, and some may have environmental or health restrictions from the municipality due to coastal proximity. The plan must account for these restrictions and show the split between covered and open space, service locations and permitted areas.

Fintas is in Ahmadi governorate, a coastal villa district near Fintas Co-op and the beach.

Plots near the Fintas shoreline may be subject to an environmental protection distance set by the municipality.

Back to House plans by plot size

See also: Architectural design & drawings in Fintas

What the drawing covers - House plans by plot size

What the drawing covers

Plot dimensions read and translated into a stamped plan ready for permit submission

  • Plot dimension analysis

    Lengths, angles and net buildable area calculated before any layout begins

  • Room distribution

    Rooms and entrances arranged to suit the plot size and owner requirements

  • Setbacks and coverage

    Front, side and rear setbacks applied to match municipality regulations

  • Structural column grid

    Column positions fixed to match plot width and standard span widths

  • Building elevations

    All four elevations drawn to show the final building form on the plot

  • Licensed engineer stamp

    Drawings signed and stamped by a licensed engineer for municipality submission

How it works.

  1. Call or whatsApp us

    Send the plot number, area and intended number of floors

  2. Plot document review

    We check the title deed and survey data to confirm actual plot dimensions

  3. First draft

    Room layout, column grid and setbacks drawn and sent for your review

  4. Revision and approval

    Your comments on the layout are applied and the final version approved

  5. Stamped handover

    Signed, stamped and printed drawings delivered ready for municipality submission

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about House plans by plot size in Fintas

Call now
Does proximity to the beach affect the plan design and set-backs?

Yes, plots near the beach may be subject to environmental or health restrictions that impose additional set-backs or ban certain uses. We verify these restrictions with the municipality before drawing the plan.

How are permitted open spaces calculated on a coastal plot?

We measure the entire plot and subtract the required set-backs and coastal restrictions, then calculate the net area permitted for building, garden and parking, respecting the ratios set by the municipality.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works