
House plans by plot size in Fintas
Plot-based planning in Fintas starts by measuring your actual land and converting it into an approved drawing ready for licensing. We read the plot dimensions, set-backs and nearby coastal restrictions, then draw the boundaries and internal spaces under area rules.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Fintas is a coastal and medium-density residential district with villas on plots between 700 and 1200 square metres, some near the beach and some set back. Each plot has defined set-backs from the street and side boundaries, and some may have environmental or health restrictions from the municipality due to coastal proximity. The plan must account for these restrictions and show the split between covered and open space, service locations and permitted areas.
Fintas is in Ahmadi governorate, a coastal villa district near Fintas Co-op and the beach.
Plots near the Fintas shoreline may be subject to an environmental protection distance set by the municipality.

What the drawing covers
Plot dimensions read and translated into a stamped plan ready for permit submission

Plot dimension analysis
Lengths, angles and net buildable area calculated before any layout begins

Room distribution
Rooms and entrances arranged to suit the plot size and owner requirements

Setbacks and coverage
Front, side and rear setbacks applied to match municipality regulations

Structural column grid
Column positions fixed to match plot width and standard span widths

Building elevations
All four elevations drawn to show the final building form on the plot

Licensed engineer stamp
Drawings signed and stamped by a licensed engineer for municipality submission
How it works.
Call or whatsApp us
Send the plot number, area and intended number of floors
Plot document review
We check the title deed and survey data to confirm actual plot dimensions
First draft
Room layout, column grid and setbacks drawn and sent for your review
Revision and approval
Your comments on the layout are applied and the final version approved
Stamped handover
Signed, stamped and printed drawings delivered ready for municipality submission
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for House plans by plot size
Other services in Fintas
Questions about House plans by plot size in Fintas
Call nowDoes proximity to the beach affect the plan design and set-backs?
Yes, plots near the beach may be subject to environmental or health restrictions that impose additional set-backs or ban certain uses. We verify these restrictions with the municipality before drawing the plan.
How are permitted open spaces calculated on a coastal plot?
We measure the entire plot and subtract the required set-backs and coastal restrictions, then calculate the net area permitted for building, garden and parking, respecting the ratios set by the municipality.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps