
Electrical drawings in Sharq
Electrical drawings in Sharq cover high-rise residential towers and commercial centres with complex multi-floor distribution systems. We produce a complete layout mapping every circuit and distribution board before any wiring starts, to prevent rework and schedule delays.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sharq towers are 15 to 25 storeys, each floor holding multiple apartments, common corridors and air wells. This demands clear separation of main meters, sub-meters and circuits for each residential unit. The drawing maps vertical cable routes within columns and walls, floor-level distribution boards, and load distribution across transformers. We cross-check structural drawings to avoid conflicts with load-bearing columns or beams.
Sharq is in Capital governorate, a district of high-rise residential towers near Kuwait Bay and Kuwait Towers.
Design code separates the main meter from sub-distribution boards at intervals not exceeding three floors in residential towers.

What the drawing covers
A complete electrical layout that maps every circuit and connection point across the building

Circuit distribution
Load groups divided into separate, correctly sized circuits

Main distribution panel
Panel location, breaker count and circuit labelling shown clearly

Lighting and outlet points
Every light, socket and switch drawn at its exact position

Heavy appliance feeds
Dedicated circuits for air-conditioning units, kitchen and water heaters

Structural coordination
Conduit routes planned to avoid columns and beams on the drawings

Licensed engineer stamp
Drawing signed by a licensed electrical engineer for municipality acceptance
How it works.
First contact
Call or WhatsApp and share the existing architectural floor plan
Brief collection
We confirm appliance list, security systems and panel position with you
Draft drawing
Circuits, outlets and lighting points are drawn across all floors
Review and revision
Draft is shared for your review and any agreed changes are applied
Final delivery
You receive the stamped drawing ready for municipality submission and site use
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Electrical drawings
Other services in Sharq
Questions about Electrical drawings in Sharq
Call nowHow is electricity distributed to multiple apartments on the same floor?
The drawing specifies a sub-distribution board per floor section and a separate meter for each apartment. We map cable routes from the board to each unit with breaker sizes and wire gauges matched to the load.
Does the plan include cable routes between floors and load-bearing columns?
Yes, we define vertical routes within and outside columns and safe clearances from structural elements. This ensures no conflict with load-bearing columns or beams during installation.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps