
Two-storey annex in Fintas
Two-storey villa annexes in Fintas expand residential space on medium-sized coastal plots with structural design adapted to the coastal environment and high humidity. We use salt- and rust-resistant materials and robust water drainage.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Fintas coastal residential plots range from 500 to 800 square metres, mostly modern or mid-age villas designed to capture sea views. A two-storey annex in this coastal area requires special waterproofing and salt and humidity protection, as the marine environment accelerates concrete and steel corrosion. We use sulphate-resistant cement, horizontal slabs with clear drainage gaps, and coat all reinforcement with thick protective layers. We also consider wind direction and humidity when planning window and ventilation openings.
Fintas is in Ahmadi governorate, a coastal residential neighbourhood near the co-op and beach with modern buildings and sea views.
Coastal drainage and airborne salt require annual steel and concrete inspection to prevent surface spalling.

What the work covers
Design, permits, structure, finishing, and handover for a two-storey annex

Drawings and permits
Annex drawings prepared and permit file submitted to the municipality

Concrete frame
Reinforced columns, beams, and slabs for both floors

Structural tie-in
Dowel bars drilled and epoxy-fixed into existing columns and beams

Walls and insulation
Block walls built with thermal and waterproof insulation to roof

Services rough-in
Drainage, electrical, and water lines laid before floor screeds

Full finishing
Tiling, gypsum, paint, aluminium, and glazing to handover
How it works.
First contact
Call or WhatsApp us to describe the villa and available plot area
Site assessment
We visit to inspect foundations, columns, and municipality setback limits
Design and permits
Structural and architectural drawings prepared and permit file submitted
Construction and supervision
Excavation, pour, block work, and finishing under continuous engineering supervision
Handover
Final inspection and handover with as-built drawings and site documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Two-storey annex
Other services in Fintas
Questions about Two-storey annex in Fintas
Call nowHow do you protect the annex from coastal salt and moisture?
We use sulphate-resistant cement and reinforcement coated with thick paint layers. Every concrete surface is sealed with a waterproof thermal barrier, and potential gaps and cracks are sealed before construction completion.
Do salt and humidity affect construction speed or the pouring method?
Yes, we minimize exposure to coastal air and use concrete mix enhanced with mineral additives. Pouring is slightly slower to allow better curing and control concrete shrinkage.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps