Annex construction in Kuwait - Abbasiya

Annex construction in Abbasiya

Villa annexes in Abbasiya are designed on stable family residential plots with careful attention to municipality-approved setbacks. We deliver the annex with a solid frame and service extensions ready for finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya is a relatively modern residential area with varied villas on plots of 400 to 700 square metres. Most of the district is newer, meaning foundations are deep and soil pre-inspected by the municipality. An annex benefits from this, but still needs a quick inspection of the original foundation and load calculation. We follow code in separating electrical and water lines, and coordinate with utility companies to extend or install new metres.

Abbasiya is located in Farwaniya governorate, a recently developed residential neighbourhood with orderly villa layouts.

An annex in Abbasiya benefits from modern foundations and pre-inspected soil, which speeds up the execution schedule.

Back to Annex construction

What we build for you - Annex construction

What we build for you

From a single room addition to a full two-storey annex, designed and permitted.

  • Annex design

    Architectural and structural drawings prepared for municipality permit submission.

  • Outdoor annex construction

    Ground-level reinforced concrete annex with its own independent foundation.

  • Two-storey annex

    Two-floor addition with a foundation sized for the full combined load.

  • Annex renovation

    Demolish, replan, and rebuild an existing annex to a new layout.

  • Structural tie-in

    Epoxy dowels and bonding agents tying new concrete to the existing frame.

  • Annex finishing

    Block walls, plaster, tiling, and aluminium works to match the main villa.

How it works.

  1. Call or whatsApp

    Share photos and the plot; a site visit is arranged.

  2. Site assessment

    Structural check of the existing villa and plot boundary review.

  3. Design and permit

    Drawings prepared and submitted to the municipality for approval.

  4. Construction

    Foundation, frame, tie-in work, block walls, slab, and finishing.

  5. Handover

    Snagging completed, keys and approved drawings handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex construction in Abbasiya

Call now
Can the annex be completely independent with entirely separate metres?

Yes, if you prefer. We install separate water, electrical and drainage metres for the annex and file separate applications with the utility companies. It requires an additional municipality clearance but is entirely feasible.

What is the typical timeline from permit approval to handing over the annex as a complete frame?

From municipality approval to handing over the frame and services typically takes three to four months, depending on the annex size and soil type. Finishing comes afterward as you choose.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works