Adding floors to modern villas and residential buildings in new Jahra relies on strong, documented concrete frames. We evaluate original designs and execute reinforcement, pouring and handover based on approved drawings.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Villas and residential buildings in new Jahra were built within the past twenty years to known engineering standards with deep foundations and clearly distributed columns. Most have municipality-approved drawings showing each foundation load and column spacing. When adding a floor, we review original drawings and verify that foundations are designed with safety margin for additional load. We widen columns with added reinforcement along each existing span, and pour the new floor using the same grid system.

New Jahra sits in Jahra governorate, a modern residential district near Jahra Mall where villas and buildings are well-documented.

We request a copy of the original approved drawings from the owner or municipality before beginning any assessment or reinforcement work.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Jahra (New)

Call now
Do the villa's original drawings help in designing the new floor?

Yes, significantly. The drawings tell us each foundation load, column spacing and concrete sections, so we calculate added load accurately and design only the reinforcement needed.

Is pouring the new floor different from pouring the first floor?

Slight difference. We use the same concrete and reinforcement standards, but must isolate the first floor during pouring with temporary barriers to prevent water or excess mixture from entering.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works