
Additional floor in Subbiya
Adding a floor in Subbiya requires careful assessment of foundations on medium-density sandy soil. We test the existing structure and raise new columns and beams with precisely calculated load ratios.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most houses in Subbiya sit on sandy soil with varying compaction, plots ranging 500 to 700 square metres. Houses are usually two or three storeys, some on pile foundations because surface soil is damp. When planning an added floor, we must test soil depth and may need additional foundations or wider piles. Coordination with Jahra municipality inspector is essential before excavation.
Subbiya sits in Jahra governorate near Sheikh Jaber Al-Ahmad Causeway.
Sandy soil in Subbiya requires compaction and bearing-capacity tests before designing any new foundations.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Subbiya
Questions about Additional floor in Subbiya
Call nowCan we add a floor to a house with older pile foundations?
Yes, but we inspect the condition of existing piles and their capacity for extra load. We may add new piles or strengthen them with concrete sleeves.
How long does the geotechnical assessment take before construction starts?
Typically 1 to 2 weeks of on-site boring and testing plus result analysis. After that we deliver a report with foundation and structural design recommendations.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps