Additional floor in Kuwait - Salmi

Additional floor in Salmi

Adding a floor in Salmi requires comprehensive study of houses on border plots with seasonally salt-affected soil. We inspect existing foundations and frames, and design columns and beams resistant to corrosion and additional load.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salmi is a border area near the Kuwait-Iraq crossing, with residential houses having shallow foundations and simple columns on medium plots. Soil here has high salt content worsened near the border, affecting concrete and reinforcement over time. When adding a new floor, we sample soil and concrete to measure actual salinity and corrosion, use salt-resistant concrete and reinforcement coated with extra protection. We also inspect whether current foundations have been salt-corroded.

Salmi lies in Jahra governorate, a residential area near the northern border region with Iraq.

We test salt content in soil and concrete, and use coated reinforcement with protective coatings before pouring new concrete.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Salmi

Call now
How does salinity affect foundations and the new floor?

Salt reacts with concrete and steel causing corrosion and cracking. We use low-water-ratio concrete and reinforcement coated with epoxy or stainless alloys to protect the new floor.

Are old foundations in Salmi safe for an additional floor's load?

It depends on actual corrosion level. We sample foundations to inspect concrete depth and reinforcement condition, and if corrosion is severe, we recommend reinforcement with concrete collars or epoxy injection before the new floor begins.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works