Additional floor in Kuwait - Saad Al-Abdullah City

Additional floor in Saad Al-Abdullah City

Adding a floor to your house in Saad Al-Abdullah City means assessing your current structure's load capacity and reinforcing it before raising new foundations and columns. We start with soil and existing concrete testing, then design the new structural system in parallel with municipality approvals.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Villas in Saad Al-Abdullah City are usually built on regular plots around 600 square metres with uniform setbacks on all sides. Most are two to three storeys, and the soil is relatively firm. When adding a floor, existing strip foundations must be tested to see if they handle the new load or need deepening and widening. We coordinate with the soil engineer and municipality inspector before any excavation begins.

Saad Al-Abdullah City is in Jahra governorate, a planned residential district with regular plot layouts.

Strip foundations in Saad Al-Abdullah City typically run 1.5 to 2 metres deep in firm soil.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Saad Al-Abdullah City

Call now
How do we verify the current foundations can support an extra floor?

We test existing concrete and analyse the soil beneath current foundations, then calculate new loads with a structural engineer. If needed, we deepen or widen the foundations before raising new columns.

Can construction proceed without fully shutting down house use?

It depends on scope. External reinforcement and foundation deepening can minimise household disruption. However, scaffolding and pouring new floors will restrict movement inside the house during active work phases.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works