
Additional floor in Ruqqa
Adding a floor to a house in Ruqqa starts with a comprehensive study of the current structure and underground foundations. We assess load capacity, execute necessary reinforcement, then pour the new storey with precise engineering coordination.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Houses in the Ruqqa residential area vary in age and size, with plots ranging from 600 to 900 square metres, typically carrying three floors. Many older houses were built without advanced soil studies, and their columns may lack sufficient reinforcement for extra load. We inspect existing concrete using non-destructive methods, assess steel quality and reinforcement, then determine whether reinforcement through adding adjacent columns or strengthening existing ones is necessary.
Ruqqa is in Ahmadi governorate in a stable residential area away from coastal zones, where soil is more stable.
Non-destructive concrete testing is required to determine existing column strength before any reinforcement or new pouring.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Ruqqa
Questions about Additional floor in Ruqqa
Call nowDo we need to separate the new floor from the old building with a gap?
No, it must be fully structurally connected. A gap can cause structural problems under load. We pour the new work connected to existing columns or to adjacent columns bonded to them.
How do you confirm reinforcement is sound before pouring?
We inspect columns and foundations with non-destructive testing equipment, take concrete samples for lab testing, and verify bonding of new steel to existing. The site engineer approves each step before pouring begins.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps