Additional floor in Kuwait - Maqwa

Additional floor in Maqwa

Adding a floor to a house in Maqwa starts with comprehensive assessment of foundations and frame in a harsh environment. We design necessary reinforcements, submit plans to the municipality, then execute upgrades and pouring to safely complete the new floor.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Maqwa is an industrial residential area with individual houses on 600 to 900 square metre plots near oil wells and facilities. The soil is saline and hard in deeper layers, and environmental conditions are harsh with high humidity and salinity that damage concrete and steel. Most homes have simple three-storey frames, and cracks or rebar corrosion from salt exposure are common. When adding a floor, we test existing concrete and rebar strength and use salt-resistant concrete and materials for reinforcements.

Maqwa is in Ahmadi governorate, an industrial residential area near oil installations and wells.

Salt-resistant materials such as high-strength concrete and galvanised rebar are essential for long-term construction in Maqwa.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Maqwa

Call now
Does the salinity in Maqwa soil affect adding a new floor?

Yes, salinity causes rebar corrosion and rapid concrete deterioration. We use salt-resistant concrete and galvanised steel in all reinforcements and new pours.

Do I need to reinforce existing foundations if the house is on saline soil?

Usually yes. We inspect foundations for salt damage and measure current soil properties; reinforcement prevents future settlement and ensures the additional floor is safely supported.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works