
What sets this area apart
Wafra is a rural residential area with villas and small apartment buildings on relatively large plots; older structures are prone to moisture due to proximity to the Saudi border and high groundwater. Roofs may be weak or cracked from moisture damage, requiring thorough remediation and precise inspection before new pouring. Villa columns are often few and small, so adding a floor means recalculating total loads and lateral forces, especially for wind exposure in outer areas.
Wafra sits in Ahmadi governorate, a rural residential district near the Saudi border with a farming cooperative and scattered villas.
Groundwater level in Wafra is very close to surface, requiring moisture-barrier inspection on roofs and foundations before any addition.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Wafra
Questions about Rooftop floor addition in Wafra
Call nowHow do you address moisture and cracking in old roofs before adding a floor?
We inspect waterproofing layers and trace moisture sources, then repair cracks with epoxy injection and renew the seal layer if needed. New pouring begins only after the roof is completely dry.
Do villas in Wafra have few enough columns that a new floor can be safely supported?
Most villas have very few columns, so a new floor requires adding new columns or substantially reinforcing foundations. We calculate complete loads including lateral wind forces typical for the area.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps