Additional floor in Kuwait - Qairawaan

Additional floor in Qairawaan

Adding a floor in Qairawaan requires comprehensive evaluation of the existing villa or building structure and foundation load capacity. We test materials and soil and provide a safe structural design before any pouring.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qairawaan buildings range from villas to residential apartments on medium to large plots, some new and some dating to the 1980s and 1990s. Seventh Ring Road nearby is congested, and buildings typically have reasonable setbacks. We test each building individually due to varying construction materials and footing types, and address any foundational cracks or damage before adding the new floor.

Qairawaan is in the Capital governorate near Seventh Ring Road in a scattered residential district.

Qairawaan buildings vary widely in age and construction standards, requiring unique site assessment for each plot before floor-addition approval.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Qairawaan

Call now
Do minor foundation cracks affect the ability to add a floor?

Yes, even minor cracks can indicate slow foundation deterioration. We inspect them closely and inject epoxy if needed before adding new load.

What is the difference between reinforcing old versus modern foundations in Qairawaan?

Older footings may be shallow or lightly reinforced, so we expand them or add piles. Modern ones are usually adequate, but we verify depth and rebar with testing before proceeding.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works