
Additional floor in Mubarakiya Camps
Adding a floor to a residential house in Mubarakiya Camps requires thorough assessment of the existing frame on mixed urban soil. We evaluate foundations, columns and beams, and ensure safe connection of the new floor while complying with local municipal regulations.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Houses in Mubarakiya Camps are architecturally varied; some are old with one or two storeys of stone walls, others newer with three storeys of block and concrete, all on relatively small plots. The soil is mixed sand, clay and old fill, so foundation depth and type vary. Adding a floor to an old house here requires precise geotechnical testing and possibly major reinforcement of footings and columns. Proximity to Mubarakiya market means equipment and material movement may be restricted during construction.
Mubarakiya Camps lies in Kuwait Capital governorate near the historic Mubarakiya market, an old mixed-use residential area.
Mixed soil in Mubarakiya Camps requires testing samples from at least 3 metres depth before designing any addition.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Mubarakiya Camps
Questions about Additional floor in Mubarakiya Camps
Call nowHow do we handle mixed soil when adding a floor?
We take soil samples at various depths and test them in an approved lab. Mixed soil may be weak, so we may need deeper piles or significantly widen existing footings.
Does proximity to Mubarakiya market affect adding a floor?
Yes, there may be restrictions on truck and equipment movement by the municipality or traffic control. We coordinate beforehand with the municipality to set working hours and permitted routes for materials and waste.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps