Additional floor in Kuwait - Julaiaa

Additional floor in Julaiaa

Adding a floor in Julaiaa starts with comprehensive inspection of the house foundation and bearing soil in the southern zone. We design and build the new frame complying with engineering inspection and local standards.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Julaiaa houses are typically one or two storeys on medium plots in a relatively flat desert zone. The soil is mixed sand and gravel, sometimes damp in certain seasons. Before adding a floor, we must inspect existing foundations and sample soil at adequate depth. Some plots may need soil improvement or foundation level raising if the bearing layer is weak or very deep.

Julaiaa is in Ahmadi governorate, a southern region with variable sandy and gravelly soils.

Bearing layer depth in Julaiaa ranges from two to five metres, affecting additional foundation design.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Julaiaa

Call now
Do we need soil improvement before adding a floor in Julaiaa?

It depends on soil test results. If the bearing layer is near and strong, improvement may not be needed. If it is deep or weak, we use piles or expanded footings.

What if soil becomes damp in a certain season?

We account for seasonal dampness by increasing foundation depth and adding side drainage around footings to prevent water pooling and bearing capacity loss.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works