Additional floor in Kuwait - Zour

Additional floor in Zour

Adding a floor to a power plant or control building in Zour begins with assessing beams and columns under client supervision. We handle every step from structural review through pouring and finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Zour industrial buildings are mostly power-generation towers, control halls and complex technical workshops. These facilities bear heavy loads and high ambient temperatures, requiring special thermal insulation in any addition. Foundations are very deep because the soil is weak sand and settlement has occurred over time. Before any work, we need extra security clearances from the plant and comprehensive inspection of electrical machinery axes and critical service routes.

Zour lies in Ahmadi governorate, home to Al-Zour power generation facility and heavy industrial infrastructure.

We map critical and electrical service routes before any excavation or test boring on an industrial site.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Zour

Call now
How do you handle security clearances for the industrial facility?

We coordinate with the plant's security and safety team before any site visit and comply with entry checks. All staff carry approved access badges, and we schedule work during approved downtime periods.

Is thermal insulation critical for a new floor near power generation equipment?

Very much so. High temperatures can weaken concrete and reinforcement. We use heat-treated concrete and insulating coatings on exposed surfaces, and locate mechanical attachments away from heat sources.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works